{"id":1196,"date":"2015-10-29T11:29:45","date_gmt":"2015-10-29T01:29:45","guid":{"rendered":"http:\/\/demo.proteusthemes.com\/export-carpress\/?p=1196"},"modified":"2018-11-16T10:46:12","modified_gmt":"2018-11-16T00:46:12","slug":"visy-coolaroo","status":"publish","type":"post","link":"https:\/\/protechwelding.com.au\/?p=1196","title":{"rendered":"<span class=\"light\">VISY<\/span> (Coolaroo)"},"content":{"rendered":"<p><em>18<sup>th<\/sup> of Oct. \u2013 29<sup>th<\/sup> of Oct. 2015<\/em><\/p>\n<p><img loading=\"lazy\" class=\"alignright size-full wp-image-1730\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2015\/07\/Visy-logo.png\" alt=\"Visy logo\" width=\"222\" height=\"128\" \/>As part of Visy\u2019s continual investment in clean energy, their second clean energy plant located in Coolaroo, VIC was due for a scheduled shutdown.<\/p>\n<p>Over the course of 11 days, 27 tradesmen were deployed in a 24 hour (12hr shifts) rostering cycle. Protech Welding P\/L was given the opportunity to display exceptional operational skills and people management skills, as well as outstanding Special-Class skills.<\/p>\n<p>As a result, Protech Welding P\/L was able to outperform VISY\u2019s constringent and comprehensive QC (Quality Control). With successful completion of the Coolaroo shutdown project, VISY has extended their acceptance of Protech Welding P\/L as their preferred Special-Class tradesmen supplier with the overall engineering aspects managed by DME\u2013Engineering Services P\/L.<\/p>\n<p><img loading=\"lazy\" class=\"size-full wp-image-1729 alignnone\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2015\/07\/Visy-colaroo1.jpg\" alt=\"Visy colaroo1\" width=\"773\" height=\"443\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2015\/07\/Visy-colaroo1.jpg 773w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2015\/07\/Visy-colaroo1-300x172.jpg 300w\" sizes=\"(max-width: 773px) 100vw, 773px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>18th of Oct. \u2013 29th of Oct. 2015 As part of Visy\u2019s continual investment in clean energy, their second clean [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":1732,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[24,21],"tags":[],"_links":{"self":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/1196"}],"collection":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1196"}],"version-history":[{"count":4,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/1196\/revisions"}],"predecessor-version":[{"id":1767,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/1196\/revisions\/1767"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/media\/1732"}],"wp:attachment":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1196"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1196"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1196"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}