{"id":2043,"date":"2018-10-29T23:18:44","date_gmt":"2018-10-29T13:18:44","guid":{"rendered":"https:\/\/protechwelding.com.au\/?p=2043"},"modified":"2018-11-16T10:32:37","modified_gmt":"2018-11-16T00:32:37","slug":"2043-2","status":"publish","type":"post","link":"https:\/\/protechwelding.com.au\/?p=2043","title":{"rendered":"<span class=\"light\">GE_Tallawarra<\/span> Flexi Suite(FS4) Installation 2018"},"content":{"rendered":"<p>Flexi Suite (FS4) Installation and Tie-in<\/p>\n<p>&nbsp;<\/p>\n<table width=\"0\">\n<tbody>\n<tr>\n<td width=\"131\"><strong>Client<\/strong><\/td>\n<td>Energy Australia, General Electrics<\/td>\n<\/tr>\n<tr>\n<td width=\"131\"><strong>Location<\/strong><\/td>\n<td>Tallawarra Power Station\u00a0 (Energy Australia)<\/td>\n<\/tr>\n<tr>\n<td width=\"131\"><strong>Job Title<\/strong><\/td>\n<td>Flexi Suite (FS4) Installation<\/td>\n<\/tr>\n<tr>\n<td width=\"131\"><strong>Service<\/strong><\/td>\n<td>Specialised Welding (Gr. P91) &amp; Fabrication<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Scope of Work<\/strong><\/p>\n<p>Flexi Suite Pipe Welding (Gr. P91) \/ Fuel Gas Modification<\/p>\n<p>Condensate Drain Tie-in \/ Local Pipe supports \/ Hydraulic Test<\/p>\n<p><strong>Project Resourcing<\/strong><\/p>\n<p>Workshop personnel included Coded Welders and Boilermakers. The support team included Project Management, Quality Management, Project Engineering and Project Supervisor.<\/p>\n<p><strong>Project Achievements<\/strong><\/p>\n<p>We\u2019ve proudly completed the project with high standard performance on schedule.<\/p>\n<p>Due to the nature of the high-pressure pipe installation, there were high standard requirements in Safety, Qualify and Project &amp; Schedule management.<\/p>\n<p>All procedures were qualified and approved by International and Australian standards prior to the project commencing<\/p>\n<ul>\n<li><strong>Zero (0) Lost Time Incident<\/strong> during the project (3,050 MHRS)<\/li>\n<li><strong>Zero failure rate<\/strong> on all welding (108 welding joints- ASTM A335, P91 Grade)<\/li>\n<li>100% Radiology Test (RT) conducted<\/li>\n<li>Project delivered on time and on budget even with the additional scope of work<\/li>\n<li>Complete conformance to AS1210-2010 Class 1<\/li>\n<li>Protech Welding Pty Ltd worked closely with the client nominated International Welding engineer\/ consultant to ensure all project quality requirements where exceeded for the duration of the project<\/li>\n<\/ul>\n<p><strong>Activities<\/strong><\/p>\n<ul>\n<li>Extensive interaction with our client to ensure the quality of the finished product was in line with practical requirements, such as;\n<ul>\n<li>Site Survey, Material Receiving Inspection, Addition Purchase Order &amp; Fabrication<\/li>\n<\/ul>\n<\/li>\n<li>Project and quality management<\/li>\n<\/ul>\n<p><strong>Project Images<\/strong><\/p>\n<p><strong>\u00a0\u00a0<img loading=\"lazy\" class=\"alignnone wp-image-2045\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181020_123643650.jpg\" alt=\"KakaoTalk_20181020_123643650\" width=\"408\" height=\"306\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181020_123643650.jpg 960w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181020_123643650-400x300.jpg 400w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181020_123643650-300x225.jpg 300w\" sizes=\"(max-width: 408px) 100vw, 408px\" \/><img loading=\"lazy\" class=\"alignnone wp-image-2046\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181020_123645745.jpg\" alt=\"KakaoTalk_20181020_123645745\" width=\"408\" height=\"306\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181020_123645745.jpg 960w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181020_123645745-400x300.jpg 400w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181020_123645745-300x225.jpg 300w\" sizes=\"(max-width: 408px) 100vw, 408px\" \/> <\/strong><\/p>\n<p><strong><img loading=\"lazy\" class=\"alignnone wp-image-2047\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181020_123652966.jpg\" alt=\"KakaoTalk_20181020_123652966\" width=\"407\" height=\"543\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181020_123652966.jpg 720w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181020_123652966-225x300.jpg 225w\" sizes=\"(max-width: 407px) 100vw, 407px\" \/>\u00a0<img loading=\"lazy\" class=\"alignnone wp-image-2044\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181020_123641091.jpg\" alt=\"KakaoTalk_20181020_123641091\" width=\"402\" height=\"536\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181020_123641091.jpg 720w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181020_123641091-225x300.jpg 225w\" sizes=\"(max-width: 402px) 100vw, 402px\" \/><\/strong><\/p>\n<p><strong><img loading=\"lazy\" class=\"alignnone wp-image-2048\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181020_123659694.jpg\" alt=\"KakaoTalk_20181020_123659694\" width=\"406\" height=\"304\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181020_123659694.jpg 960w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181020_123659694-400x300.jpg 400w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181020_123659694-300x225.jpg 300w\" sizes=\"(max-width: 406px) 100vw, 406px\" \/> <img loading=\"lazy\" class=\"alignnone wp-image-2049\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181008_130832525.jpg\" alt=\"KakaoTalk_20181008_130832525\" width=\"408\" height=\"307\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181008_130832525.jpg 960w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181008_130832525-400x300.jpg 400w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20181008_130832525-300x225.jpg 300w\" sizes=\"(max-width: 408px) 100vw, 408px\" \/><\/strong><\/p>\n<p><strong><img loading=\"lazy\" class=\"alignnone wp-image-2050\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20180917_145843877.jpg\" alt=\"KakaoTalk_20180917_145843877\" width=\"292\" height=\"389\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20180917_145843877.jpg 720w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20180917_145843877-225x300.jpg 225w\" sizes=\"(max-width: 292px) 100vw, 292px\" \/> <img loading=\"lazy\" class=\"alignnone wp-image-2051\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20180929_191202392.jpg\" alt=\"KakaoTalk_20180929_191202392\" width=\"522\" height=\"391\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20180929_191202392.jpg 960w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20180929_191202392-400x300.jpg 400w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2018\/10\/KakaoTalk_20180929_191202392-300x225.jpg 300w\" sizes=\"(max-width: 522px) 100vw, 522px\" \/><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Flexi Suite (FS4) Installation and Tie-in &nbsp; Client Energy Australia, General Electrics Location Tallawarra Power Station\u00a0 (Energy Australia) Job Title [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":2048,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[24,20],"tags":[],"_links":{"self":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/2043"}],"collection":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2043"}],"version-history":[{"count":5,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/2043\/revisions"}],"predecessor-version":[{"id":2056,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/2043\/revisions\/2056"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/media\/2048"}],"wp:attachment":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2043"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2043"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2043"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}