{"id":2339,"date":"2019-06-06T09:14:02","date_gmt":"2019-06-05T23:14:02","guid":{"rendered":"https:\/\/protechwelding.com.au\/?p=2339"},"modified":"2019-06-07T12:59:40","modified_gmt":"2019-06-07T02:59:40","slug":"energy-australia_hrh-ip-bypass-de-superheater-replacement","status":"publish","type":"post","link":"https:\/\/protechwelding.com.au\/?p=2339","title":{"rendered":"<span class=\"light\">Energy<\/span> Australia_HRH &#038; IP BYPASS De-superheater Replacement"},"content":{"rendered":"<p>&nbsp;<\/p>\n<table width=\"548\">\n<tbody>\n<tr>\n<td style=\"text-align: left;\" width=\"131\"><strong>Client<\/strong><\/td>\n<td width=\"417\">Energy Australia<\/td>\n<\/tr>\n<tr>\n<td width=\"131\"><strong>Location<\/strong><\/td>\n<td width=\"417\">Tallawarra Power Station\u00a0 (Energy Australia)<\/td>\n<\/tr>\n<tr>\n<td width=\"131\"><strong>Job Title<\/strong><\/td>\n<td width=\"417\">Hot ReHeat (HRH) and IP by-pass De-super Heater Replacement<\/td>\n<\/tr>\n<tr>\n<td width=\"131\"><strong>Service<\/strong><\/td>\n<td width=\"417\">HRH &amp; IP Bypass De-super Heater Replacement<\/p>\n<p>Specialised Welding (including Gr. P91 &amp; P22) &amp; PWHT<\/p>\n<p>Related plant items removal and reinstatement<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Scope of Work<\/strong><\/p>\n<ul>\n<li>Existing Pipe assembly removal and manoeuvre the new assembly<\/li>\n<li>Install the new de-superheaters (bored, fit up &amp; welding -Gr. P91) &amp; PWHT (Post-Weld Heat Treatment)<\/li>\n<li>Removal and reinstatement of the plant obstacle items<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Project Requirement<\/strong><\/p>\n<p>Extensive interaction with our client to ensure quality of finished product is in line with practical requirements, such as;<\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li>Project Management Plan &amp; Approval<\/li>\n<\/ul>\n<p>Method Statement\/ Detail Program &amp; Shifting Plan<\/p>\n<p>Training, Communication &amp; Reporting<\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li>QA\/QC Plan Approval &amp; Monitoring<\/li>\n<\/ul>\n<p>Welding specification (WPS, PQR, WPQ), ITP, NDT coordination &amp; Repair (if required)<\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li>Safety Management Plan &amp; Execution<\/li>\n<\/ul>\n<p>Equipment testing, tagging &amp; registration, SWMS, Lifting Study<\/p>\n<p><strong>Project Resourcing<\/strong><\/p>\n<p>Workshop personnel included Coded Welders and Boilermakers. The support team included Project Management, Quality Management, Project Engineering and Project Supervisor.<\/p>\n<p><strong>Project Achievements<\/strong><\/p>\n<p>We\u2019ve proudly completed the project with high standard performance on schedule.<\/p>\n<p>Due to the nature of the high-pressure pipe installation, there were high standard requirements in Safety, Qualify and Project &amp; Schedule management.<\/p>\n<p>All procedures were qualified and approved by Energy Australia (EA) and Australian standards prior to the project commencement.<\/p>\n<ul>\n<li><strong>Zero (0) Lost Time Incident<\/strong> during the project (4,963 MHRS)<\/li>\n<li><strong>Zero failure rate<\/strong> on all welding (including P91 &amp; P22 )<\/li>\n<li>100% NDT conducted<\/li>\n<li>Project delivered on time and on budget meeting the Quality requirement<\/li>\n<li>Protech Welding Pty Ltd worked closely with the client nominated project &amp; quality engineer (consultant) to ensure all project quality requirements where exceeded for the duration of the project<\/li>\n<\/ul>\n<p><img loading=\"lazy\" class=\"alignleft wp-image-2373\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/HRH-1.png\" alt=\"HRH 1\" width=\"649\" height=\"593\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/HRH-1.png 1402w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/HRH-1-300x274.png 300w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/HRH-1-1024x935.png 1024w\" sizes=\"(max-width: 649px) 100vw, 649px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" class=\"alignleft wp-image-2374\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/HRH-2.png\" alt=\"HRH 2\" width=\"647\" height=\"819\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/HRH-2.png 1405w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/HRH-2-237x300.png 237w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/HRH-2-809x1024.png 809w\" sizes=\"(max-width: 647px) 100vw, 647px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" class=\"alignleft wp-image-2375\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/HRH-3.png\" alt=\"HRH 3\" width=\"648\" height=\"588\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/HRH-3.png 1405w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/HRH-3-300x272.png 300w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/HRH-3-1024x929.png 1024w\" sizes=\"(max-width: 648px) 100vw, 648px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" class=\"alignleft  wp-image-2377\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/IP-1.png\" alt=\"IP 1\" width=\"645\" height=\"585\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/IP-1.png 1404w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/IP-1-300x272.png 300w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/IP-1-1024x928.png 1024w\" sizes=\"(max-width: 645px) 100vw, 645px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" class=\"alignleft  wp-image-2379\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/IP-2-1.png\" alt=\"IP 2\" width=\"647\" height=\"705\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/IP-2-1.png 1404w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/IP-2-1-275x300.png 275w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/IP-2-1-940x1024.png 940w\" sizes=\"(max-width: 647px) 100vw, 647px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" class=\"alignleft  wp-image-2381\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/IP-3-1.png\" alt=\"IP 3\" width=\"647\" height=\"525\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/IP-3-1.png 1401w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/IP-3-1-300x243.png 300w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/06\/IP-3-1-1024x830.png 1024w\" sizes=\"(max-width: 647px) 100vw, 647px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; Client Energy Australia Location Tallawarra Power Station\u00a0 (Energy Australia) Job Title Hot ReHeat (HRH) and IP by-pass De-super Heater [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":2346,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[24,25,1],"tags":[],"_links":{"self":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/2339"}],"collection":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2339"}],"version-history":[{"count":14,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/2339\/revisions"}],"predecessor-version":[{"id":2382,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/2339\/revisions\/2382"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/media\/2346"}],"wp:attachment":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2339"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2339"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2339"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}