{"id":2706,"date":"2019-11-02T09:46:29","date_gmt":"2019-11-01T23:46:29","guid":{"rendered":"https:\/\/protechwelding.com.au\/?p=2706"},"modified":"2019-11-02T11:01:57","modified_gmt":"2019-11-02T01:01:57","slug":"ge-fieldcore_installation-of-gt-econ-bypass-line","status":"publish","type":"post","link":"https:\/\/protechwelding.com.au\/?p=2706","title":{"rendered":"<span class=\"light\">GE<\/span> FIELDCORE_Installation of GT ECON BYPASS LINE"},"content":{"rendered":"<p>&nbsp;<\/p>\n<table width=\"737\">\n<tbody>\n<tr>\n<td width=\"75\">\u00a0<strong>Client<\/strong><\/td>\n<td width=\"520\">GE FIELDCORE INTERNATIONAL<\/td>\n<\/tr>\n<tr>\n<td width=\"75\"><strong>Location<\/strong><\/td>\n<td width=\"520\">SWANBANK POWERSTATION<\/td>\n<\/tr>\n<tr>\n<td width=\"75\"><strong>Job Title<\/strong><\/td>\n<td width=\"520\">Installation of GT ECON BYPASS LINE<\/td>\n<\/tr>\n<tr>\n<td width=\"75\"><strong>Service<\/strong><\/td>\n<td width=\"520\">Identify the inlet line &amp; remove the insulation<\/p>\n<p>Installation the 2-equal tee after a taking-off point<\/p>\n<p>Install the MOV in the GT Econ Bypass Line (Welding &#8211; SA105 GR.B)<\/p>\n<p>Paint the existing supports (Spec. HI TEMP 400)<\/p>\n<p>&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Scope of Work(OCT 2019)<\/strong><\/p>\n<ul>\n<li>Installation and Welding\u00a0(On material SA105 GR.B)<\/li>\n<\/ul>\n<p><strong>Project Resourcing<\/strong><\/p>\n<p>Onsite personnel included Coded Welders &amp; Rigger &amp; Boilermaker &amp; Trades Assistant<\/p>\n<p><strong>Project Achievements<\/strong><\/p>\n<p>We\u2019ve proudly completed the project with high standard performance\u00a0as per the client&#8217;s request<\/p>\n<ul>\n<li><strong>Zero (0) Lost Time Incident<\/strong>\u00a0during the project<\/li>\n<li><strong>Zero failure rate<\/strong>\u00a0on all welding<\/li>\n<li>Project delivered on time<\/li>\n<li>Protech Welding Pty Ltd worked closely with the client nominated project &amp; quality engineer (consultant)<\/li>\n<\/ul>\n<p><strong>Project\u00a0images<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-full wp-image-2711\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/11\/MOB.png\" alt=\"MOB\" width=\"934\" height=\"532\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/11\/MOB.png 934w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/11\/MOB-300x171.png 300w\" sizes=\"(max-width: 934px) 100vw, 934px\" \/> <img loading=\"lazy\" class=\"alignleft size-full wp-image-2712\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/11\/WELDING.png\" alt=\"WELDING\" width=\"934\" height=\"826\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/11\/WELDING.png 934w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/11\/WELDING-300x265.png 300w\" sizes=\"(max-width: 934px) 100vw, 934px\" \/><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-full wp-image-2710\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/11\/INSTAL.png\" alt=\"INSTAL\" width=\"934\" height=\"992\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/11\/INSTAL.png 934w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/11\/INSTAL-282x300.png 282w\" sizes=\"(max-width: 934px) 100vw, 934px\" \/><img loading=\"lazy\" class=\"alignleft size-full wp-image-2709\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/11\/COMP.png\" alt=\"COMP\" width=\"934\" height=\"1046\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/11\/COMP.png 934w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/11\/COMP-268x300.png 268w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2019\/11\/COMP-914x1024.png 914w\" sizes=\"(max-width: 934px) 100vw, 934px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; \u00a0Client GE FIELDCORE INTERNATIONAL Location SWANBANK POWERSTATION Job Title Installation of GT ECON BYPASS LINE Service Identify the inlet [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":2714,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[24,25,1],"tags":[],"_links":{"self":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/2706"}],"collection":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2706"}],"version-history":[{"count":4,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/2706\/revisions"}],"predecessor-version":[{"id":2716,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/2706\/revisions\/2716"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/media\/2714"}],"wp:attachment":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2706"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2706"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2706"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}