{"id":3113,"date":"2020-11-24T13:41:06","date_gmt":"2020-11-24T03:41:06","guid":{"rendered":"https:\/\/protechwelding.com.au\/?p=3113"},"modified":"2020-11-26T08:27:02","modified_gmt":"2020-11-25T22:27:02","slug":"ge-renewable-wind-farm-steel-tower-repair","status":"publish","type":"post","link":"https:\/\/protechwelding.com.au\/?p=3113","title":{"rendered":"<span class=\"light\">GE<\/span> RENEWABLE Wind Farm Steel Tower Repair"},"content":{"rendered":"\n<p><strong>Wind Farm Damaged steel tower repair&nbsp;<\/strong><\/p>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container\">\n<p><strong>Client<\/strong> &nbsp;                                 GE Renewable Energy (onshore wind department)<br><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Location<\/strong>                              Bango Wind Farm in Yass, NSW<br><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Job Title<\/strong>                               Damaged steel tower section repair<br><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Service<\/strong>                                 Steel column repair<br><\/p>\n\n\n\n<p><\/p>\n<\/div><\/div>\n\n\n\n<p><strong>Scope of Work<\/strong><\/p>\n\n\n\n<p>Removing the defect area, Repair welding &amp; Non-destructive Test, Repair Paint<\/p>\n\n\n\n<p><strong>Project Resourcing<\/strong><\/p>\n\n\n\n<p>Workshop personnel included Coded Welders and Boilermakers. The support team included Project Management, Quality Management, Project Engineering and Project Supervisor.<\/p>\n\n\n\n<p><strong>Project Achievements<\/strong><\/p>\n\n\n\n<p>We\u2019ve proudly completed the project with high standard performance on schedule.<\/p>\n\n\n\n<p>All procedures were qualified and approved by International and Australian standards prior to the project commencing<\/p>\n\n\n\n<ul><li><strong>Zero (0) Lost Time Incident<\/strong>&nbsp;during the project<\/li><li><strong>Zero failure rate<\/strong>&nbsp;on all welding<\/li><li>Project delivered on time and on budget<\/li><li>Protech Welding Pty Ltd worked closely with the client nominated Welding engineer\/ consultant in headquarter to ensure all project quality requirements where exceeded for the duration of the project<\/li><\/ul>\n\n\n\n<p><strong>Activities<\/strong><\/p>\n\n\n\n<ul><li>Extensive interaction with our client to ensure quality of finished product was in line with practical requirements, especially to set up the repair methodology at beginning stage.<\/li><li>Project and quality management<\/li><\/ul>\n\n\n\n<p><strong>Project Images\u00a0<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3 is-cropped\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"592\" height=\"311\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/2.1-1.png\" alt=\"\" data-id=\"3163\" data-full-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/2.1-1.png\" data-link=\"https:\/\/protechwelding.com.au\/ge-renewable-wind-farm-steel-tower-repair\/2-1-1\/\" class=\"wp-image-3163\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/2.1-1.png 592w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/2.1-1-300x158.png 300w\" sizes=\"(max-width: 592px) 100vw, 592px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"960\" height=\"721\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/2-3.jpg\" alt=\"\" data-id=\"3166\" data-full-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/2-3.jpg\" data-link=\"https:\/\/protechwelding.com.au\/ge-renewable-wind-farm-steel-tower-repair\/2-3-3\/\" class=\"wp-image-3166\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/2-3.jpg 960w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/2-3-300x225.jpg 300w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/2-3-400x300.jpg 400w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"596\" height=\"233\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/2.2-1.png\" alt=\"\" data-id=\"3164\" data-full-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/2.2-1.png\" data-link=\"https:\/\/protechwelding.com.au\/ge-renewable-wind-farm-steel-tower-repair\/2-2-1\/\" class=\"wp-image-3164\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/2.2-1.png 596w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/2.2-1-300x117.png 300w\" sizes=\"(max-width: 596px) 100vw, 596px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"598\" height=\"270\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/2.3-1.png\" alt=\"\" data-id=\"3165\" data-full-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/2.3-1.png\" data-link=\"https:\/\/protechwelding.com.au\/ge-renewable-wind-farm-steel-tower-repair\/2-3-1\/\" class=\"wp-image-3165\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/2.3-1.png 598w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/2.3-1-300x135.png 300w\" sizes=\"(max-width: 598px) 100vw, 598px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"960\" height=\"721\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/1-1.jpg\" alt=\"\" data-id=\"3161\" data-full-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/1-1.jpg\" data-link=\"https:\/\/protechwelding.com.au\/ge-renewable-wind-farm-steel-tower-repair\/1-1\/\" class=\"wp-image-3161\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/1-1.jpg 960w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/1-1-300x225.jpg 300w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/1-1-400x300.jpg 400w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"719\" height=\"960\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/3-2.jpg\" alt=\"\" data-id=\"3167\" data-full-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/3-2.jpg\" data-link=\"https:\/\/protechwelding.com.au\/ge-renewable-wind-farm-steel-tower-repair\/3-2-2\/\" class=\"wp-image-3167\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/3-2.jpg 719w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/3-2-225x300.jpg 225w\" sizes=\"(max-width: 719px) 100vw, 719px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"540\" height=\"960\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/6-2.jpg\" alt=\"\" data-id=\"3168\" data-full-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/6-2.jpg\" data-link=\"https:\/\/protechwelding.com.au\/ge-renewable-wind-farm-steel-tower-repair\/6-2-2\/\" class=\"wp-image-3168\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/6-2.jpg 540w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/6-2-169x300.jpg 169w\" sizes=\"(max-width: 540px) 100vw, 540px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"960\" height=\"540\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/7-2.jpg\" alt=\"\" data-id=\"3169\" data-full-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/7-2.jpg\" data-link=\"https:\/\/protechwelding.com.au\/ge-renewable-wind-farm-steel-tower-repair\/7-2-2\/\" class=\"wp-image-3169\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/7-2.jpg 960w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/7-2-300x169.jpg 300w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"960\" height=\"540\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/8-2.jpg\" alt=\"\" data-id=\"3170\" data-full-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/8-2.jpg\" data-link=\"https:\/\/protechwelding.com.au\/ge-renewable-wind-farm-steel-tower-repair\/8-2-2\/\" class=\"wp-image-3170\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/8-2.jpg 960w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/8-2-300x169.jpg 300w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"960\" height=\"540\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/10-2.jpg\" alt=\"\" data-id=\"3171\" data-full-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/10-2.jpg\" data-link=\"https:\/\/protechwelding.com.au\/ge-renewable-wind-farm-steel-tower-repair\/10-2-2\/\" class=\"wp-image-3171\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/10-2.jpg 960w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/10-2-300x169.jpg 300w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"960\" height=\"540\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/11-2.jpg\" alt=\"\" data-id=\"3172\" data-full-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/11-2.jpg\" data-link=\"https:\/\/protechwelding.com.au\/ge-renewable-wind-farm-steel-tower-repair\/11-2-2\/\" class=\"wp-image-3172\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/11-2.jpg 960w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/11-2-300x169.jpg 300w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"960\" height=\"540\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/12-2.jpg\" alt=\"\" data-id=\"3173\" data-full-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/12-2.jpg\" data-link=\"https:\/\/protechwelding.com.au\/ge-renewable-wind-farm-steel-tower-repair\/12-2-2\/\" class=\"wp-image-3173\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/12-2.jpg 960w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/12-2-300x169.jpg 300w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"960\" height=\"540\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/55-2.jpg\" alt=\"\" data-id=\"3177\" data-full-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/55-2.jpg\" data-link=\"https:\/\/protechwelding.com.au\/ge-renewable-wind-farm-steel-tower-repair\/55-2\/\" class=\"wp-image-3177\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/55-2.jpg 960w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/55-2-300x169.jpg 300w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"719\" height=\"960\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/99-2.jpg\" alt=\"\" data-id=\"3178\" data-full-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/99-2.jpg\" data-link=\"https:\/\/protechwelding.com.au\/ge-renewable-wind-farm-steel-tower-repair\/99-2\/\" class=\"wp-image-3178\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/99-2.jpg 719w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/99-2-225x300.jpg 225w\" sizes=\"(max-width: 719px) 100vw, 719px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"719\" height=\"960\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/13-2.jpg\" alt=\"\" data-id=\"3174\" data-full-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/13-2.jpg\" data-link=\"https:\/\/protechwelding.com.au\/ge-renewable-wind-farm-steel-tower-repair\/13-2-2\/\" class=\"wp-image-3174\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/13-2.jpg 719w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/13-2-225x300.jpg 225w\" sizes=\"(max-width: 719px) 100vw, 719px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"719\" height=\"960\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/14-2.jpg\" alt=\"\" data-id=\"3175\" data-full-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/14-2.jpg\" data-link=\"https:\/\/protechwelding.com.au\/ge-renewable-wind-farm-steel-tower-repair\/14-2-2\/\" class=\"wp-image-3175\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/14-2.jpg 719w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/14-2-225x300.jpg 225w\" sizes=\"(max-width: 719px) 100vw, 719px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"960\" height=\"721\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/15-2.jpg\" alt=\"\" data-id=\"3176\" data-full-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/15-2.jpg\" data-link=\"https:\/\/protechwelding.com.au\/ge-renewable-wind-farm-steel-tower-repair\/15-2-2\/\" class=\"wp-image-3176\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/15-2.jpg 960w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/15-2-300x225.jpg 300w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2020\/11\/15-2-400x300.jpg 400w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure><\/li><\/ul><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Wind Farm Damaged steel tower repair&nbsp; Client &nbsp; GE Renewable Energy (onshore wind department) Location Bango Wind Farm in Yass, [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":3129,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[24,31,29],"tags":[],"_links":{"self":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3113"}],"collection":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3113"}],"version-history":[{"count":7,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3113\/revisions"}],"predecessor-version":[{"id":3180,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3113\/revisions\/3180"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/media\/3129"}],"wp:attachment":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3113"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3113"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3113"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}