{"id":3347,"date":"2021-08-10T14:00:51","date_gmt":"2021-08-10T04:00:51","guid":{"rendered":"https:\/\/protechwelding.com.au\/?p=3347"},"modified":"2021-08-18T18:28:48","modified_gmt":"2021-08-18T08:28:48","slug":"agl-bayswater-hep-spe-fac-tapping-point","status":"publish","type":"post","link":"https:\/\/protechwelding.com.au\/?p=3347","title":{"rendered":"<span class=\"light\">AGL<\/span> BAYSWATER HEP &#038; SPE\/FAC &#038; TAPPING POINT"},"content":{"rendered":"\n<p><strong>Client<\/strong>&nbsp;&nbsp; AGL Energy Limited<\/p>\n\n\n\n<p><strong>Location<\/strong>&nbsp;Bayswater Power Station<\/p>\n\n\n\n<p><strong>Job Title<\/strong>&nbsp;HEP &amp; SPE\/FAC &amp; TAPPING POINT<\/p>\n\n\n\n<p><strong>Service<\/strong>\u00a0Planning \/ Welding \/ Heat treatment \/ Scaffolding \/ Machining \/ Equipment and tool supply<\/p>\n\n\n\n<p><strong>Scope of Work &amp; Summary of Work Progress<\/strong><\/p>\n\n\n\n<p>Replacement of main steam drains and \u201cT\u201d section include branch and weld repairs.<\/p>\n\n\n\n<p>Install additional new pressure and temperature tapping points.<\/p>\n\n\n\n<p>Inspection to determine the ongoing fitness for services.<\/p>\n\n\n\n<p>(Summary of Work Progress)<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Work Description<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Total Progress<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Plan<\/strong><strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Actual<\/strong><strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Variance<\/strong><strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Site Preparation<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">0<strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">MS -B \u201cT\u201d replacement<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">0<strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">MS-C \u201cT\u201d replacement<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">0<strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">HP Bypass \u201cT\u201d replacement<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">0<strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">LP Bypass \u201cT\u201d replacement<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">0<strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">MS-B FW07<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">0<strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">LB-01 MS<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">0<strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">LB-01 HPB<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">0<strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">LB-01 LPB<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">0<strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">LB-01 HRH<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">0<strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Contingency (1 out of 4)<\/td><td class=\"has-text-align-center\" data-align=\"center\">25%<\/td><td class=\"has-text-align-center\" data-align=\"center\">20<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">25<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">5<strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Tapping Point<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">0<strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">SPE\/FAC<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">90<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">10<strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Total<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>100%<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>89.50<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>91.44<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>1.94<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>`<\/p>\n\n\n\n<p><strong>Project Resourcing<\/strong><\/p>\n\n\n\n<p>Workshop personnel included Coded Welders and Boilermakers. The support team included Project Management, Quality Management, Project Engineer and Project Supervisor. Protech Welding putted more than 29,000 hours with Zero LTI &amp; MTI for total duration of the work (91days).<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>Man hrs<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Achievement<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Duration<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>29,736<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>ZERO LTI &amp; MTI<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>91 Days<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>(Health, Safety and Environment Statistics)<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>No.<\/strong><\/td><td><strong>Description<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Cumulative<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td>SIF \u2013 Serious Impact Fatality<\/td><td class=\"has-text-align-center\" data-align=\"center\">None<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td>LTI \u2013 Lost Time Injury<\/td><td class=\"has-text-align-center\" data-align=\"center\">None<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td>MTI \u2013 Medical Treatment Injury<\/td><td class=\"has-text-align-center\" data-align=\"center\">None<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td>FAI \u2013 First Aid Injury<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td>SWA \u2013 Stop Work Authority<\/td><td class=\"has-text-align-center\" data-align=\"center\">None<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td>Near Miss Level 3<\/td><td class=\"has-text-align-center\" data-align=\"center\">None<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td>Near Miss Level 2<\/td><td class=\"has-text-align-center\" data-align=\"center\">None<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td>Near Miss Level 1<\/td><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">9<\/td><td>Environmental Incidents<\/td><td class=\"has-text-align-center\" data-align=\"center\">None<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>(Health, Safety and Environment Performance (Inc. Subcontractors))<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>No.<\/strong><\/td><td><strong>Description<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Cumulative<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td>Safety Interaction<\/td><td class=\"has-text-align-center\" data-align=\"center\">105<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td>Group Take 5\u2019s<\/td><td class=\"has-text-align-center\" data-align=\"center\">1,396<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td>Passive Alcohol Test (Random)<\/td><td class=\"has-text-align-center\" data-align=\"center\">Random<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td>Supervisor Site Walks<\/td><td class=\"has-text-align-center\" data-align=\"center\">65<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td>Critical Control Check<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Project Achievements<\/strong><\/p>\n\n\n\n<p>We\u2019ve proudly completed the project with high standard performance on schedule.<\/p>\n\n\n\n<p>All procedures were qualified and approved by International and Australian standards prior to the project commencement<\/p>\n\n\n\n<ul><li><strong>Zero (0) Lost Time Incident<\/strong>&nbsp;during the project<\/li><li>Project delivered on time and under budget<\/li><li>Protech Welding Pty Ltd worked closely with the client nominated Welding engineer\/ consultant in headquarter to ensure all project quality requirements were exceeded for the duration of the project<\/li><\/ul>\n\n\n\n<p>(Project Weld Achievement)<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td><strong>Description<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Total Weld Joints<\/strong> (inc MT \/ PT \/ UT)<\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Total DNC<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Weld Failure Rates<\/strong><\/td><\/tr><tr><td>LB-02 \u2013 MS B &amp; C Drain Pot T<\/td><td class=\"has-text-align-center\" data-align=\"center\">15<\/td><td class=\"has-text-align-center\" data-align=\"center\">&#8211;<\/td><td class=\"has-text-align-center\" data-align=\"center\">0 %<\/td><\/tr><tr><td>LB-02 \u2013 LP Bypass T<\/td><td class=\"has-text-align-center\" data-align=\"center\">10<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">10 %<\/td><\/tr><tr><td>LB-02 \u2013 MS to HP Bypass T<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">&#8211;<\/td><td class=\"has-text-align-center\" data-align=\"center\">0 %<\/td><\/tr><tr><td>LB-02 \u2013 MS B FW07 Repair<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">&#8211;<\/td><td class=\"has-text-align-center\" data-align=\"center\">0 %<\/td><\/tr><tr><td>LB-01 \u2013 Contingency MS- A<\/td><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td class=\"has-text-align-center\" data-align=\"center\">&#8211;<\/td><td class=\"has-text-align-center\" data-align=\"center\">0 %<\/td><\/tr><tr><td>MA-01 \u2013 Tapping Point<\/td><td class=\"has-text-align-center\" data-align=\"center\">27<\/td><td class=\"has-text-align-center\" data-align=\"center\">&#8211;<\/td><td class=\"has-text-align-center\" data-align=\"center\">0 %<\/td><\/tr><tr><td>CMR 235 &amp; Valves \u2013 LAD01-01<\/td><td class=\"has-text-align-center\" data-align=\"center\">18<\/td><td class=\"has-text-align-center\" data-align=\"center\">&#8211;<\/td><td class=\"has-text-align-center\" data-align=\"center\">0 %<\/td><\/tr><tr><td>CMR 235 \u2013 LAC01-03<\/td><td class=\"has-text-align-center\" data-align=\"center\">11<\/td><td class=\"has-text-align-center\" data-align=\"center\">&#8211;<\/td><td class=\"has-text-align-center\" data-align=\"center\">0 %<\/td><\/tr><tr><td>CMR 235 \u2013 LBC01-03<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">&#8211;<\/td><td class=\"has-text-align-center\" data-align=\"center\">0 %<\/td><\/tr><tr><td><strong>Total Weld Achievement<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">92<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>1.08%<\/strong><strong><\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Activities<\/strong><\/p>\n\n\n\n<ul><li>Extensive interaction with our client to ensure quality of finished product was in line with practical requirements, especially to set up the repair methodology in the beginning stage.<\/li><li>Project and quality management<\/li><\/ul>\n\n\n\n<p>(Safety KPI Activities)<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>Item No.<\/strong><\/td><td><strong>Highlights Description<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td>Dashpivot: Contactless Sign &amp; Out, HSE Management Document<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td>Pipe Covers &amp; Drop Zone Prevention around Floor Penetrations<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td>Take 5 Draw (Bunnings Voucher)<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td>Alcohol Tester in place<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td>Rigging Tool Box Arrangement &amp; Cabinet<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td>Permit Board with extra slots for supporting documents<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td>Drop Prevention installed around work areas (Leather Blankets, plywood, Shade cloth and Uni-mesh)<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td>Water Station at Level 2<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Project Images<\/strong><\/p>\n\n\n\n<div class=\"wp-block-columns\">\n<div class=\"wp-block-column\" style=\"flex-basis:100%\">\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/1-4.jpg\" alt=\"\" class=\"wp-image-3417\" width=\"900\" height=\"757\"\/><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/2-5.jpg\" alt=\"\" class=\"wp-image-3418\" width=\"900\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/2-5.jpg 622w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/2-5-210x300.jpg 210w\" sizes=\"(max-width: 622px) 100vw, 622px\" \/><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/3-3.jpg\" alt=\"\" class=\"wp-image-3419\" width=\"900\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/3-3.jpg 622w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/3-3-228x300.jpg 228w\" sizes=\"(max-width: 622px) 100vw, 622px\" \/><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter is-resized\"><img src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/4-3.jpg\" alt=\"\" class=\"wp-image-3420\" width=\"900\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/4-3.jpg 621w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/4-3-245x300.jpg 245w\" sizes=\"(max-width: 621px) 100vw, 621px\" \/><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter is-resized\"><img src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/5-3.jpg\" alt=\"\" class=\"wp-image-3421\" width=\"900\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/5-3.jpg 609w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/5-3-300x230.jpg 300w\" sizes=\"(max-width: 609px) 100vw, 609px\" \/><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter is-resized\"><img src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/6-2.jpg\" alt=\"\" class=\"wp-image-3422\" width=\"900\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/6-2.jpg 613w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/6-2-232x300.jpg 232w\" sizes=\"(max-width: 613px) 100vw, 613px\" \/><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter is-resized\"><img src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/7-3.jpg\" alt=\"\" class=\"wp-image-3423\" width=\"900\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/7-3.jpg 615w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/7-3-232x300.jpg 232w\" sizes=\"(max-width: 615px) 100vw, 615px\" \/><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter is-resized\"><img src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/8-3.jpg\" alt=\"\" class=\"wp-image-3424\" width=\"900\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/8-3.jpg 613w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/8-3-300x243.jpg 300w\" sizes=\"(max-width: 613px) 100vw, 613px\" \/><\/figure><\/div>\n<\/div>\n<\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Client&nbsp;&nbsp; AGL Energy Limited Location&nbsp;Bayswater Power Station Job Title&nbsp;HEP &amp; SPE\/FAC &amp; TAPPING POINT Service\u00a0Planning \/ Welding \/ Heat treatment [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":3351,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[24,34],"tags":[],"_links":{"self":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3347"}],"collection":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3347"}],"version-history":[{"count":9,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3347\/revisions"}],"predecessor-version":[{"id":3428,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3347\/revisions\/3428"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/media\/3351"}],"wp:attachment":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3347"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3347"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3347"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}