{"id":3368,"date":"2021-08-10T14:08:58","date_gmt":"2021-08-10T04:08:58","guid":{"rendered":"https:\/\/protechwelding.com.au\/?p=3368"},"modified":"2021-08-25T15:39:36","modified_gmt":"2021-08-25T05:39:36","slug":"ea-tallawarra-power-station-emergency-shutdown-works","status":"publish","type":"post","link":"https:\/\/protechwelding.com.au\/?p=3368","title":{"rendered":"<span class=\"light\">EA<\/span> Tallawarra Power Station Emergency Shutdown Works"},"content":{"rendered":"\n<p><strong>Client<\/strong>&nbsp;&nbsp; Energy Australia<\/p>\n\n\n\n<p><strong>Location<\/strong>&nbsp;Tallawarra Power Station in Yallah, NSW<\/p>\n\n\n\n<p><strong>Job Title<\/strong>&nbsp;Emergency Shutdown Works<\/p>\n\n\n\n<p><strong>Service<\/strong>&nbsp;Welding \/ Heat treatment \/ Equipment and tool supply<\/p>\n\n\n\n<p><strong>Scope of Work<\/strong><\/p>\n\n\n\n<ul><li>IP Bypass Valve Cap and Mesh<\/li><li>Condenser Wall Crack Repair<\/li><li>GT Exhaust Repairs<\/li><\/ul>\n\n\n\n<p>(Work Scope Summary)<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td><strong>Work Description<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Total Progress<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Plan<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Actual<\/strong><strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Variance<\/strong><strong><\/strong><\/td><\/tr><tr><td>IP Bypass valve cap and mesh<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">92<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">8<strong><\/strong><\/td><\/tr><tr><td>Condenser Wall Crack Repair<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">0<strong><\/strong><\/td><\/tr><tr><td>GT Exhaust repairs<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">95<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">5<strong><\/strong><\/td><\/tr><tr><td><strong>Total<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>100%<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>100<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>95.6<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>4.4<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Project Resourcing<\/strong><\/p>\n\n\n\n<p>Workshop personnel included Coded Welders and Boilermakers. The support team included Project Management, Quality Management, Project Engineer and Project Supervisor.<\/p>\n\n\n\n<p><strong>Documents Supplied<\/strong><\/p>\n\n\n\n<ul><li>ITP<\/li><li>PWHT INSTRUCTION<\/li><li>WPS &amp; PQR<\/li><li>Crew Qualification<\/li><li>Completion Report<\/li><\/ul>\n\n\n\n<p>(Protech Welding Man Hours)<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>Period<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Man hrs<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Achievement<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Duration<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Protech Welding<\/td><td class=\"has-text-align-center\" data-align=\"center\">1415<\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>ZERO LTI &amp; MTI<\/strong><strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">13 Days<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>(Health, Safety and Environment Performance (Inc. Subcontractors))<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>No.<\/strong><\/td><td><strong>Description<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Cumulative<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td>Safety Interaction<\/td><td class=\"has-text-align-center\" data-align=\"center\">13<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td>Group Take 5\u2019s<\/td><td class=\"has-text-align-center\" data-align=\"center\">105<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td>Passive Alcohol Test (Random)<\/td><td class=\"has-text-align-center\" data-align=\"center\">N\/A<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td>Supervisor Site Walks<\/td><td class=\"has-text-align-center\" data-align=\"center\">11<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td>Critical Control Check<\/td><td class=\"has-text-align-center\" data-align=\"center\">Ventilation Check<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Project Achievements<\/strong><\/p>\n\n\n\n<p>We\u2019ve proudly completed the project with high standard performance on schedule.<\/p>\n\n\n\n<p>All procedures were qualified and approved by International and Australian standards prior to the project commencement:<\/p>\n\n\n\n<ul><li><strong>Zero (0) Lost Time Incident<\/strong>&nbsp;during the project<\/li><li><strong>Zero failure rate<\/strong>&nbsp;on overall welding<\/li><li>Project delivered on time and under budget<\/li><li>Protech Welding Pty Ltd worked closely with the client nominated Welding engineer\/ consultant in headquarter to ensure all project quality requirements were exceeded for the duration of the project<\/li><\/ul>\n\n\n\n<p><strong>Activities<\/strong><\/p>\n\n\n\n<ul><li>Extensive interaction with our client to ensure quality of finished product was in line with practical requirements, especially to set up the repair methodology at beginning stage.<\/li><li>Project and quality management<\/li><\/ul>\n\n\n\n<p><strong>Project Images<\/strong><\/p>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container\">\n<div class=\"wp-block-columns\">\n<div class=\"wp-block-column is-vertically-aligned-top\" style=\"flex-basis:100%\">\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container\">\n<div class=\"wp-block-columns\">\n<div class=\"wp-block-column\" style=\"flex-basis:100%\">\n<figure class=\"wp-block-image size-full is-resized\"><img src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/1-1.png\" alt=\"\" class=\"wp-image-3438\" width=\"900\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/1-1.png 660w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/1-1-272x300.png 272w\" sizes=\"(max-width: 660px) 100vw, 660px\" \/><\/figure>\n<\/div>\n<\/div>\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/2-3.png\" alt=\"\" class=\"wp-image-3439\" width=\"900\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/2-3.png 742w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/2-3-286x300.png 286w\" sizes=\"(max-width: 742px) 100vw, 742px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/3.png\" alt=\"\" class=\"wp-image-3440\" width=\"900\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/3.png 743w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/3-287x300.png 287w\" sizes=\"(max-width: 743px) 100vw, 743px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/4.png\" alt=\"\" class=\"wp-image-3441\" width=\"900\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/4.png 745w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2021\/08\/4-285x300.png 285w\" sizes=\"(max-width: 745px) 100vw, 745px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Client&nbsp;&nbsp; Energy Australia Location&nbsp;Tallawarra Power Station in Yallah, NSW Job Title&nbsp;Emergency Shutdown Works Service&nbsp;Welding \/ Heat treatment \/ Equipment and [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":3386,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[24,34],"tags":[],"_links":{"self":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3368"}],"collection":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3368"}],"version-history":[{"count":5,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3368\/revisions"}],"predecessor-version":[{"id":3442,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3368\/revisions\/3442"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/media\/3386"}],"wp:attachment":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3368"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3368"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3368"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}