{"id":3471,"date":"2022-02-01T11:36:19","date_gmt":"2022-02-01T00:36:19","guid":{"rendered":"https:\/\/protechwelding.com.au\/?p=3471"},"modified":"2023-06-10T15:49:02","modified_gmt":"2023-06-10T05:49:02","slug":"premier-height-solution_flagpole-wall-reinforcement","status":"publish","type":"post","link":"https:\/\/protechwelding.com.au\/?p=3471","title":{"rendered":"<span class=\"light\">60<\/span> CASTLEREAGH ST_FLAGPOLE WALL REINFORCEMENT"},"content":{"rendered":"\n<p><strong>60 Castlereagh St &#8211; Flagpole Wall Reinforcement DEC 2021<\/strong><\/p>\n\n\n\n<p><strong>Location<\/strong>&nbsp;60 Castlereagh St Sydney NSW 2000<\/p>\n\n\n\n<p><strong>Job Title<\/strong>&nbsp;Flagpole Wall Reinforcement Project<\/p>\n\n\n\n<p><strong>Service<\/strong>&nbsp;Welding\/ Equipment and tool supply<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Scope of Work<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>Work Description<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Weight Value<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Total Progress<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Plan<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Actual<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Variance<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Protection setup with Leather<\/td><td class=\"has-text-align-center\" data-align=\"center\">35%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">16 x New Plates Drilling<\/td><td class=\"has-text-align-center\" data-align=\"center\">20%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">16 x New Plates Welding<\/td><td class=\"has-text-align-center\" data-align=\"center\">15%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Drilling on Aluminium pole<\/td><td class=\"has-text-align-center\" data-align=\"center\">5%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">85<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Replacing Thread bar \/ nuts<\/td><td class=\"has-text-align-center\" data-align=\"center\">10%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">85<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Painting \/ Chemset injection \/ QC docs supply<\/td><td class=\"has-text-align-center\" data-align=\"center\">15%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Total<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">78.3%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">21.7%<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Project Resourcing<\/strong><\/p>\n\n\n\n<p>Workshop personnel included Coded Welders and Boilermakers. The support team included Project Management, Quality Management, Project Engineer and Project Supervisor.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Documents Supplied<\/strong><\/p>\n\n\n\n<ul><li>WPS &amp; WPQR<\/li><li>Crew Qualification<\/li><li>WMS (Work Method Statement)<\/li><li>ITP<\/li><li>SWMS<\/li><li>Completion Report<\/li><\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Safety Plan for Work<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/image.png\" alt=\"\" class=\"wp-image-3472\" width=\"734\" height=\"738\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/image.png 689w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/image-298x300.png 298w\" sizes=\"(max-width: 734px) 100vw, 734px\" \/><\/figure>\n\n\n\n<p>(Health, Safety and Environment Performance (Inc. Subcontractors))<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>No.<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Description<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Cumulative<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">SAFETY INTERACTION<\/td><td class=\"has-text-align-center\" data-align=\"center\">N\/A<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td class=\"has-text-align-center\" data-align=\"center\">SCAFFOLDING<\/td><td class=\"has-text-align-center\" data-align=\"center\">N\/A<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">TEST AND TAG, RIGGING INSPECTION<\/td><td class=\"has-text-align-center\" data-align=\"center\">N\/A<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">WORKING AT HEIGHT (HARNESS)<\/td><td class=\"has-text-align-center\" data-align=\"center\">WAH Check<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">DROP ZONE COVERED BY 3 X 3 LEATHER WELDING BLANKET<\/td><td class=\"has-text-align-center\" data-align=\"center\">N\/A<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Project Achievements<\/strong><\/p>\n\n\n\n<p>We\u2019ve proudly completed the project with high standard performance on schedule.<\/p>\n\n\n\n<p>All procedures were qualified and approved by International and Australian standards prior to the project commencement:<\/p>\n\n\n\n<ul><li><strong>Zero (0) Lost Time Incident, Zero NCR <\/strong>during the project<\/li><li><strong>Zero failure rate<\/strong>&nbsp;on overall welding<\/li><li>Project delivered on time and under budget<\/li><li>Protech Welding Pty Ltd worked closely with the client nominated Welding engineer\/ consultant in headquarter to ensure all project quality requirements were exceeded for the duration of the project<\/li><\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Activities<\/strong><\/p>\n\n\n\n<ul><li>Extensive interaction with our client to ensure quality of finished product was in line with practical requirements, especially to set up the repair methodology\/ safety blanket at beginning stage.<\/li><li>Project and quality management<\/li><\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Work Photos<\/strong><\/p>\n\n\n\n<div class=\"wp-block-columns\">\n<div class=\"wp-block-column\" style=\"flex-basis:100%\">\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container\">\n<div class=\"wp-block-jetpack-tiled-gallery aligncenter is-style-rectangular\"><div class=\"tiled-gallery__gallery\"><div class=\"tiled-gallery__row\"><div class=\"tiled-gallery__col\" style=\"flex-basis:63.58766%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"319\" data-id=\"3474\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3474\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/10.png\" data-width=\"433\" src=\"https:\/\/i0.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/10.png?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><div class=\"tiled-gallery__col\" style=\"flex-basis:36.41234%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"594\" data-id=\"3475\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3475\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/01.png\" data-width=\"461\" src=\"https:\/\/i1.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/01.png?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><\/div><div class=\"tiled-gallery__row\"><div class=\"tiled-gallery__col\" style=\"flex-basis:50.01192%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"624\" data-id=\"3476\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3476\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/02.png\" data-width=\"482\" src=\"https:\/\/i1.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/02.png?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><div class=\"tiled-gallery__col\" style=\"flex-basis:49.98808%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"895\" data-id=\"3477\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3477\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/03.jpg\" data-width=\"691\" src=\"https:\/\/i0.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/03.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><\/div><div class=\"tiled-gallery__row\"><div class=\"tiled-gallery__col\" style=\"flex-basis:61.32978%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"698\" data-id=\"3478\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3478\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/04.png\" data-width=\"900\" src=\"https:\/\/i1.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/04.png?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><div class=\"tiled-gallery__col\" style=\"flex-basis:38.67022%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"516\" data-id=\"3479\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3479\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/05.png\" data-width=\"419\" src=\"https:\/\/i1.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/05.png?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><\/div><div class=\"tiled-gallery__row\"><div class=\"tiled-gallery__col\" style=\"flex-basis:63.21460%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"923\" data-id=\"3480\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3480\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/06.jpg\" data-width=\"685\" src=\"https:\/\/i1.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/06.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><div class=\"tiled-gallery__col\" style=\"flex-basis:36.78540%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"314\" data-id=\"3481\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3481\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/07.png\" data-width=\"426\" src=\"https:\/\/i2.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/07.png?ssl=1\" data-amp-layout=\"responsive\"><\/figure><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"347\" data-id=\"3482\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3482\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/08.png\" data-width=\"459\" src=\"https:\/\/i2.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/08.png?ssl=1\" data-amp-layout=\"responsive\"><\/figure><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"367\" data-id=\"3483\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3483\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/11.png\" data-width=\"456\" src=\"https:\/\/i1.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/11.png?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><\/div><div class=\"tiled-gallery__row\"><div class=\"tiled-gallery__col\" style=\"flex-basis:49.60284%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"814\" data-id=\"3484\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3484\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/12.png\" data-width=\"581\" src=\"https:\/\/i2.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/12.png?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><div class=\"tiled-gallery__col\" style=\"flex-basis:50.39716%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"837\" data-id=\"3485\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3485\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/15-1.png\" data-width=\"607\" src=\"https:\/\/i1.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/02\/15-1.png?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><\/div><\/div><\/div>\n<\/div><\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>60 Castlereagh St &#8211; Flagpole Wall Reinforcement DEC 2021 Location&nbsp;60 Castlereagh St Sydney NSW 2000 Job Title&nbsp;Flagpole Wall Reinforcement Project [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":3564,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3471"}],"collection":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3471"}],"version-history":[{"count":5,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3471\/revisions"}],"predecessor-version":[{"id":3565,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3471\/revisions\/3565"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/media\/3564"}],"wp:attachment":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3471"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3471"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3471"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}