{"id":3493,"date":"2022-03-02T10:19:19","date_gmt":"2022-03-01T23:19:19","guid":{"rendered":"https:\/\/protechwelding.com.au\/?p=3493"},"modified":"2023-06-10T15:47:09","modified_gmt":"2023-06-10T05:47:09","slug":"world-square_cte-steel-works","status":"publish","type":"post","link":"https:\/\/protechwelding.com.au\/?p=3493","title":{"rendered":"<span class=\"light\">WORLD<\/span> SQUARE_CTE STEEL WORKS"},"content":{"rendered":"\n<p><strong>Location<\/strong>&nbsp;680 George St Sydney NSW 2000<\/p>\n\n\n\n<p><strong>Job Title<\/strong>&nbsp;World Square CTE Steel works Project<\/p>\n\n\n\n<p><strong>Service<\/strong>&nbsp;Welding and Fabrication\/ Equipment and tool supply<\/p>\n\n\n\n<p><strong>Scope of Work<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center\">(Work Scope Summary)<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-black-color has-cyan-bluish-gray-background-color has-text-color has-background\"><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>Item#<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Work Description<\/strong><strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Weight Value<\/strong><strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Location<\/strong><strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Note<\/strong><strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">Weld repair<\/td><td class=\"has-text-align-center\" data-align=\"center\">50%<\/td><td class=\"has-text-align-center\" data-align=\"center\">TBA<\/td><td class=\"has-text-align-center\" data-align=\"center\">N\/A<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td class=\"has-text-align-center\" data-align=\"center\">Fin Plate<\/td><td class=\"has-text-align-center\" data-align=\"center\">30%<\/td><td class=\"has-text-align-center\" data-align=\"center\">TBA<\/td><td class=\"has-text-align-center\" data-align=\"center\">N\/A<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">Structure<\/td><td class=\"has-text-align-center\" data-align=\"center\">20%<\/td><td class=\"has-text-align-center\" data-align=\"center\">TBA<\/td><td class=\"has-text-align-center\" data-align=\"center\">N\/A<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>&nbsp;<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Total<\/strong><strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>100%<\/strong><strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>&nbsp;<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>&nbsp;<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"940\" height=\"699\" src=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/image.png\" alt=\"\" class=\"wp-image-3494\" srcset=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/image.png 940w, https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/image-300x223.png 300w\" sizes=\"(max-width: 940px) 100vw, 940px\" \/><\/figure>\n\n\n\n<p><strong>Project Resourcing<\/strong><\/p>\n\n\n\n<p>Workshop personnel included Coded Welders and Boilermakers. The support team included Project Management, Quality Management, Project Engineer and Project Supervisor.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Methodology (Work Sequence)<\/strong><\/p>\n\n\n\n<p>1. Obtain the correct permit for Hot-works (Welding \/ Grinding)<\/p>\n\n\n\n<p>2. Obtain the correct permit for Work in Heights (Harness)<\/p>\n\n\n\n<p>3. Obtain the correct permit for BMU Operation<\/p>\n\n\n\n<p>4. Pre-start BMU before use<\/p>\n\n\n\n<p>5. Set up the Power distribution board (lifeguard 32amps) if required<\/p>\n\n\n\n<p>6. Check the \u201cInspection report\u201d to confirm the location \/ Process required<\/p>\n\n\n\n<p>7. NDT (V.T) on the Steel surface and Surface preparation by Grinder<\/p>\n\n\n\n<p>8. Cut out the OLD section \/ Measuring and cut NEW to the size<\/p>\n\n\n\n<p>9. Cover up the area with Monarflex sheet around (If required)<\/p>\n\n\n\n<p>10. Set up the Welding Equipment \/ Welding Consumables ready<\/p>\n\n\n\n<p>11.&nbsp; Wind Speed Anemometer ready (calibrated)<\/p>\n\n\n\n<p>12. Fit up the new piece and Fit-up check by inspector If required<\/p>\n\n\n\n<p>13. Carry out the welding with Approved WPS (MMAW)<\/p>\n\n\n\n<p>    13a. Back-step welding technique to prevent Distortion (excessive heat input)<\/p>\n\n\n\n<p>           <em>13a-1. Amps x Volts x 0.06 divided by Travel Speed (in\/minute)<\/em><\/p>\n\n\n\n<p>    13b. Do not start if winds over 20km \/ h (TA needs to check constantly and record)<\/p>\n\n\n\n<p>    13c. Check the thickness of material to achieve the Weld Throat as required<\/p>\n\n\n\n<p>14. Carry out the NDE testing after cool down<\/p>\n\n\n\n<p>15. Clean up the area and disconnect all the Power<\/p>\n\n\n\n<p>16. Move to the next location<\/p>\n\n\n\n<p>17. Variation<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Documents Supplied\/ Training completed<\/strong><\/p>\n\n\n\n<ul><li>WPS &amp; PQR<\/li><li>Crew Qualification<\/li><li>WMS (Work Method Statement)<\/li><li>SWMS<\/li><li>Work Progress Report (Daily basis)<\/li><li>Online Induction, Site Induction, BMU Training and Working at height<\/li><\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Health and Safety Summary<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center\">(Health, Safety and Environment Performance (Inc. Subcontractors))<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>No.<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Description<\/strong><strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Cumulative<\/strong><strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">SAFETY INTERACTION<\/td><td class=\"has-text-align-center\" data-align=\"center\">N\/A<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td class=\"has-text-align-center\" data-align=\"center\">SCAFFOLDING<\/td><td class=\"has-text-align-center\" data-align=\"center\">N\/A<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">TEST AND TAG, RIGGING INSPECTION<\/td><td class=\"has-text-align-center\" data-align=\"center\">N\/A<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">WORKING AT HEIGHT (HARNESS)<\/td><td class=\"has-text-align-center\" data-align=\"center\">WAH Check<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">BMU OPERATION<\/td><td class=\"has-text-align-center\" data-align=\"center\">N\/A<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">TOOL LANYARDS AND STRAP<\/td><td class=\"has-text-align-center\" data-align=\"center\">N\/A<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Project Achievements<\/strong><\/p>\n\n\n\n<p>We\u2019ve proudly completed the project with high standard performance on schedule.<\/p>\n\n\n\n<p>All procedures were qualified and approved by International and Australian standards prior to the project commencement:<\/p>\n\n\n\n<ul><li><strong>Zero (0) Lost Time Incident, Zero NCR <\/strong>during the project<\/li><li><strong>Zero failure rate<\/strong>&nbsp;on overall welding<\/li><li>Project delivered on time and under budget<\/li><li>Protech Welding Pty Ltd worked closely with the client nominated site supervisor to ensure all project quality requirements were exceeded for the duration of the project<\/li><\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Activities<\/strong><\/p>\n\n\n\n<ul><li>Active interaction with our client to ensure quality of finished product\/ services was in line with practical requirements, especially to set up the work methodology, BMU and weather protection for power sourced equipment at preparation stage.<\/li><li>Be compliant with site rules\/ Health and safety requirements&nbsp; e.g. Thorough Wind Speed Inspection to obtain work permit before start work<\/li><li>Project and quality management<\/li><li>Constant communication with our client through work progress report on a daily basis<\/li><\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Work Photos<\/strong><\/p>\n\n\n\n<div class=\"wp-block-columns\">\n<div class=\"wp-block-column\" style=\"flex-basis:100%\">\n<div class=\"wp-block-jetpack-tiled-gallery aligncenter is-style-rectangular\"><div class=\"tiled-gallery__gallery\"><div class=\"tiled-gallery__row\"><div class=\"tiled-gallery__col\" style=\"flex-basis:25.00000%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"480\" data-id=\"3499\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3499\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/KakaoTalk_20220121_090901417_13.jpg\" data-width=\"360\" src=\"https:\/\/i1.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/KakaoTalk_20220121_090901417_13.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><div class=\"tiled-gallery__col\" style=\"flex-basis:25.00000%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1440\" data-id=\"3497\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3497\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/KakaoTalk_20220121_090901417_01-768x1024.jpg\" data-width=\"1080\" src=\"https:\/\/i2.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/KakaoTalk_20220121_090901417_01-768x1024.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><div class=\"tiled-gallery__col\" style=\"flex-basis:25.00000%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1280\" data-id=\"3496\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3496\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/01-1-768x1024.jpg\" data-width=\"960\" src=\"https:\/\/i1.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/01-1-768x1024.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><div class=\"tiled-gallery__col\" style=\"flex-basis:25.00000%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1440\" data-id=\"3498\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3498\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/KakaoTalk_20220121_090901417_06-768x1024.jpg\" data-width=\"1080\" src=\"https:\/\/i0.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/KakaoTalk_20220121_090901417_06-768x1024.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><\/div><div class=\"tiled-gallery__row\"><div class=\"tiled-gallery__col\" style=\"flex-basis:33.33333%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"800\" data-id=\"3501\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3501\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/KakaoTalk_20220124_162620304_11.jpg\" data-width=\"600\" src=\"https:\/\/i0.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/KakaoTalk_20220124_162620304_11.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><div class=\"tiled-gallery__col\" style=\"flex-basis:33.33333%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"800\" data-id=\"3500\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3500\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/KakaoTalk_20220124_162620304_08.jpg\" data-width=\"600\" src=\"https:\/\/i0.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/KakaoTalk_20220124_162620304_08.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><div class=\"tiled-gallery__col\" style=\"flex-basis:33.33333%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1440\" data-id=\"3502\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3502\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/KakaoTalk_20220131_175926683_04-768x1024.jpg\" data-width=\"1080\" src=\"https:\/\/i2.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/KakaoTalk_20220131_175926683_04-768x1024.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><\/div><div class=\"tiled-gallery__row\"><div class=\"tiled-gallery__col\" style=\"flex-basis:36.03523%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1440\" data-id=\"3503\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3503\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/KakaoTalk_20220201_162425141_03-768x1024.jpg\" data-width=\"1080\" src=\"https:\/\/i0.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/KakaoTalk_20220201_162425141_03-768x1024.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><div class=\"tiled-gallery__col\" style=\"flex-basis:63.96477%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1080\" data-id=\"3504\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3504\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/KakaoTalk_20220210_135442689_05-1024x768.jpg\" data-width=\"1440\" src=\"https:\/\/i1.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/03\/KakaoTalk_20220210_135442689_05-1024x768.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><\/div><\/div><\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Location&nbsp;680 George St Sydney NSW 2000 Job Title&nbsp;World Square CTE Steel works Project Service&nbsp;Welding and Fabrication\/ Equipment and tool supply [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":3562,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3493"}],"collection":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3493"}],"version-history":[{"count":4,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3493\/revisions"}],"predecessor-version":[{"id":3563,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3493\/revisions\/3563"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/media\/3562"}],"wp:attachment":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3493"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3493"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3493"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}