{"id":3511,"date":"2022-04-18T13:44:18","date_gmt":"2022-04-18T03:44:18","guid":{"rendered":"https:\/\/protechwelding.com.au\/?p=3511"},"modified":"2023-06-10T15:44:46","modified_gmt":"2023-06-10T05:44:46","slug":"ea-tallawarra-power-station-ip-bypass-works","status":"publish","type":"post","link":"https:\/\/protechwelding.com.au\/?p=3511","title":{"rendered":"<span class=\"light\">EA<\/span> TALLAWARRA POWER STATION EGH\/ HRSG REPAIRS"},"content":{"rendered":"\n<p><strong>EA Tallawarra Power Station <\/strong>EGH \/ HRSG repairs<\/p>\n\n\n\n<p><strong>Client<\/strong>&nbsp;&nbsp; Energy Australia<\/p>\n\n\n\n<p><strong>Location<\/strong>&nbsp;Tallawarra Power Station in Yallah, NSW<\/p>\n\n\n\n<p><strong>Job Title<\/strong>&nbsp; EGH \/ HRSG repairs <\/p>\n\n\n\n<p><strong>Service<\/strong>&nbsp;Welding \/ Heat treatment \/ Equipment and tool supply<\/p>\n\n\n\n<p><strong>Scope of Work<\/strong><\/p>\n\n\n\n<ul><li>IP Bypass Valve Replacement (P91)<\/li><li>Condenser Strut Crack Repair<\/li><li>GT Exhaust Repairs<\/li><\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p class=\"has-text-align-center\">(Work Scope Summary)<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>Work Description<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Total Progress<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Plan<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Actual<\/strong><strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Variance<\/strong><strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">IP Bypass valve replacement (P91)<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">150<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">+ 50<strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Condenser Strut Crack Repair<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">110<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">+ 10<strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">GT Exhaust repairs<\/td><td class=\"has-text-align-center\" data-align=\"center\">100%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">100<strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">0<strong><\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>Total<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>100%<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>100<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>120<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>20<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Project Resourcing<\/strong><\/p>\n\n\n\n<p>Workshop personnel included Coded Welders and Boilermakers. The support team included Project Management, Quality Management, Project Engineer and Project Supervisor.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Documents Supplied<\/strong><\/p>\n\n\n\n<ul><li>WPS &amp; PQR<\/li><li>Crew Qualification<\/li><li>Online induction<\/li><li>Completion Report<\/li><\/ul>\n\n\n\n<p class=\"has-text-align-center\">(Protech Welding Man Hours)<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>Period<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Man hrs<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Achievement<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Duration<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Protech Welding<\/td><td class=\"has-text-align-center\" data-align=\"center\">500<\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>ZERO LTI &amp; MTI<\/strong><strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">12 Days<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p class=\"has-text-align-center\">(Health, Safety and Environment Performance (Inc. Subcontractors))<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><a><strong>No.<\/strong><\/a><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Description<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Cumulative<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">Safety Interaction<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td class=\"has-text-align-center\" data-align=\"center\">Group Take 5\u2019s<\/td><td class=\"has-text-align-center\" data-align=\"center\">50<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">Passive Alcohol Test (Random)<\/td><td class=\"has-text-align-center\" data-align=\"center\">N\/A<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">Supervisor Site Walks<\/td><td class=\"has-text-align-center\" data-align=\"center\">15<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">Critical Control Check<\/td><td class=\"has-text-align-center\" data-align=\"center\">Ventilation Check<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Project Achievements<\/strong><\/p>\n\n\n\n<p>We\u2019ve proudly completed the project with high standard performance on schedule.<\/p>\n\n\n\n<p>All procedures were qualified and approved by International and Australian standards prior to the project commencement:<\/p>\n\n\n\n<ul><li><strong>Zero (0) Lost Time Incident<\/strong>&nbsp;during the project<\/li><li><strong>Zero failure rate<\/strong>&nbsp;on overall welding<\/li><li>Project delivered on time and under budget<\/li><li>Protech Welding Pty Ltd worked closely with the client nominated Site\/ Welding Supervisor to ensure all project quality requirements were exceeded for the duration of the project<\/li><\/ul>\n\n\n\n<p><strong>Activities<\/strong><\/p>\n\n\n\n<ul id=\"block-3ff67682-0d41-4233-9c07-a5c123abbac8\"><li>Extensive interaction with our client to ensure quality of finished product was in line with practical requirements<\/li><li>Project and quality management<\/li><li>Constant communication with our client through work progress report on a daily basis<\/li><\/ul>\n\n\n\n<p><strong>Work Photos<\/strong><\/p>\n\n\n\n<div class=\"wp-block-jetpack-tiled-gallery aligncenter is-style-rectangular\"><div class=\"tiled-gallery__gallery\"><div class=\"tiled-gallery__row\"><div class=\"tiled-gallery__col\" style=\"flex-basis:46.91678%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1081\" data-id=\"3540\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3540\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/01-1-1024x769.jpg\" data-width=\"1440\" src=\"https:\/\/i0.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/01-1-1024x769.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1080\" data-id=\"3543\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3543\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/04-1-1-1024x768.jpeg\" data-width=\"1440\" src=\"https:\/\/i1.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/04-1-1-1024x768.jpeg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><div class=\"tiled-gallery__col\" style=\"flex-basis:53.08322%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1440\" data-id=\"3544\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3544\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/04-2-1-767x1024.jpeg\" data-width=\"1079\" src=\"https:\/\/i2.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/04-2-1-767x1024.jpeg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><\/div><div class=\"tiled-gallery__row\"><div class=\"tiled-gallery__col\" style=\"flex-basis:63.94352%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1081\" data-id=\"3541\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3541\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/02-1-1024x769.jpg\" data-width=\"1440\" src=\"https:\/\/i2.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/02-1-1024x769.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><div class=\"tiled-gallery__col\" style=\"flex-basis:36.05648%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1440\" data-id=\"3542\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3542\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/03-1-768x1024.jpg\" data-width=\"1080\" src=\"https:\/\/i0.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/03-1-768x1024.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><\/div><div class=\"tiled-gallery__row\"><div class=\"tiled-gallery__col\" style=\"flex-basis:39.00870%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1080\" data-id=\"3545\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3545\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/05-1-1024x768.jpeg\" data-width=\"1440\" src=\"https:\/\/i1.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/05-1-1024x768.jpeg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><div class=\"tiled-gallery__col\" style=\"flex-basis:21.98260%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1440\" data-id=\"3546\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3546\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/06-1-1-767x1024.jpeg\" data-width=\"1079\" src=\"https:\/\/i2.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/06-1-1-767x1024.jpeg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><div class=\"tiled-gallery__col\" style=\"flex-basis:39.00870%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1080\" data-id=\"3548\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3548\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/07-3-1024x768.jpeg\" data-width=\"1440\" src=\"https:\/\/i1.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/07-3-1024x768.jpeg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><\/div><div class=\"tiled-gallery__row\"><div class=\"tiled-gallery__col\" style=\"flex-basis:35.99267%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1440\" data-id=\"3552\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3552\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/10-1-3-767x1024.jpg\" data-width=\"1079\" src=\"https:\/\/i1.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/10-1-3-767x1024.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><div class=\"tiled-gallery__col\" style=\"flex-basis:64.00733%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1079\" data-id=\"3550\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3550\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/09-1-3-1024x767.jpg\" data-width=\"1440\" src=\"https:\/\/i0.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/09-1-3-1024x767.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><\/div><div class=\"tiled-gallery__row\"><div class=\"tiled-gallery__col\" style=\"flex-basis:33.33333%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1440\" data-id=\"3549\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3549\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/08-3-767x1024.jpg\" data-width=\"1079\" src=\"https:\/\/i0.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/08-3-767x1024.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><div class=\"tiled-gallery__col\" style=\"flex-basis:33.33333%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1440\" data-id=\"3551\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3551\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/09-2-3-767x1024.jpg\" data-width=\"1079\" src=\"https:\/\/i0.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/09-2-3-767x1024.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><div class=\"tiled-gallery__col\" style=\"flex-basis:33.33333%\"><figure class=\"tiled-gallery__item\"><img alt=\"\" data-height=\"1440\" data-id=\"3553\" data-link=\"https:\/\/protechwelding.com.au\/?attachment_id=3553\" data-url=\"https:\/\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/10-2-3-767x1024.jpg\" data-width=\"1079\" src=\"https:\/\/i0.wp.com\/protechwelding.com.au\/wp-content\/uploads\/2022\/04\/10-2-3-767x1024.jpg?ssl=1\" data-amp-layout=\"responsive\"><\/figure><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>EA Tallawarra Power Station EGH \/ HRSG repairs Client&nbsp;&nbsp; Energy Australia Location&nbsp;Tallawarra Power Station in Yallah, NSW Job Title&nbsp; EGH [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":3560,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3511"}],"collection":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3511"}],"version-history":[{"count":4,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3511\/revisions"}],"predecessor-version":[{"id":3561,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3511\/revisions\/3561"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=\/wp\/v2\/media\/3560"}],"wp:attachment":[{"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3511"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3511"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/protechwelding.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3511"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}