VISY (Coolaroo) Scheduled Shutown

Visy-colaroo---shutdown1-main

20th of Dec. – 27th of Dec. 2015

Visy colaroo - shutdown1When it was time for the next phase of shutdown works for VISY’s Coolaroo CEP (VIC), Protech Welding P/L was the first contact on the list to manage, operate and deliver the shutdown project! Protech Welding assigned 22 Special-Class tradesmen working in a 24 hour (12 hr shifts) rostering cycle to replace a 1 inch stainless steel single tube on a Super-Heater as well as other patch works and refinements.

Again, Protech Welding P/L outperformed VISY’s expectation and as a result have secured the appointment to carry-out the next scheduled shutdown project due in March, 2016.

Visy-colaroo---shutdown2

DME Eng Services (Warragamba)

DME-wrgarbl-main

16th of Nov. – 18th of Dec. 2015

Working closely with DME Engineering Services throughout the prior VISY shutdown projects opened a new opportunity for Protech Welding P/L to work with DME Eng Services directly and exclusively. DME required 7 Special-Class tradesmen to attend their workshop located at Warragamba, NSW.

The project required our team to operate a 12 hour shift to complete numerous WIP (Working-In-Progress) projects including structures and high pressure boilers by the delivery deadline. The successful completion of each assigned project has led to a 12 month contractual supply agreement.

DME wrgarbl

VISY (Tumut)

Visy-Tutmut1-main

5th of Nov. – 17th of Nov. 2015

Visy Tutmut1With the exceeding job performance and successful completion of VISY’s Coolaroo shutdown project, Protech Welding P/L was given an urgent call. The VISY Kraft Mill Plant (Wagga Wagga, NSW) shutdown project was well underway prior to Protech Welding’s intervention. However, due to the increasing dissatisfactory work performance by the previous trades team, VISY extended the need for immediate replacement. Once our Specialised Team of 4 tradesmen attended to the site, the shutdown project was back on schedule and most importantly, back to the Highest Quality Standards as expected by VISY.

 

VISY (Coolaroo)

Visy-colaroo1-main

18th of Oct. – 29th of Oct. 2015

Visy logoAs part of Visy’s continual investment in clean energy, their second clean energy plant located in Coolaroo, VIC was due for a scheduled shutdown.

Over the course of 11 days, 27 tradesmen were deployed in a 24 hour (12hr shifts) rostering cycle. Protech Welding P/L was given the opportunity to display exceptional operational skills and people management skills, as well as outstanding Special-Class skills.

As a result, Protech Welding P/L was able to outperform VISY’s constringent and comprehensive QC (Quality Control). With successful completion of the Coolaroo shutdown project, VISY has extended their acceptance of Protech Welding P/L as their preferred Special-Class tradesmen supplier with the overall engineering aspects managed by DME–Engineering Services P/L.

Visy colaroo1